Good morning all,
Has anyone retracted a single incore thimble approximately 13' out of the reactor with the high activity thimble remaining in the incore sump room or keyway (what we call it) and abandoned it in place? If so, what did this do to the dose rates in the keyway or incore sump room? I am desperately trying to convince Engineering here that this is a bad idea.
Does anyone have documented underwater surveys of dose rates on thimbles during a campaign to replace thimbles? We have performed it but no underwater surveys were obtained that are documented and were not required surveys for the RWP. Our old thimbles were placed in a debris canister and stored in the SFP.
Thank You In Advance
Kevin Licklider
ALARA Coordinator
North Anna Power Station
540-894-2873
CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://list.rpalara.org/pipermail/global_list.rpalara.org/attachments/20211202/d1281d9e/attachment.html>
More information about the Global
mailing list